How the size is worked out
Cubic yards = length × width × height ÷ 27 × (1 + extra for loose packing)
A worked example
Debris that would stack into a block 12 by 8 by 4 feet is 14.2 cubic yards. Thrown loosely into a dumpster it takes about 17.8, so a 20 yard dumpster is the one to order.
Good to know
- Common sizes are 10, 15, 20, 30 and 40 cubic yards. A 10 yard dumpster is roughly three pickup loads.
- Every dumpster has a weight limit, and heavy debris reaches it long before the box is full. Concrete, dirt, brick and shingles usually need a small dumpster ordered specifically for heavy material.
- For a roof, use the roof tear-off calculator, which works by weight.
- Ask what is not allowed. Paint, tyres, batteries, appliances and mattresses often cost extra or are refused.
- A dumpster on the street usually needs a permit.
Common questions
Should I size up?
If you are between sizes, yes. The price difference between sizes is usually much less than a second haul.
How we know this calculator is right
Before this calculator went on the site, 8 answers were worked out separately from its code, by hand or straight from the formula above. Each time this page loads, your own browser runs the calculator on those same numbers and compares. Turn on JavaScript to see the comparison.
See every check
| Numbers used | Result | Worked out separately | This calculator |
|---|
What this proves: the calculator does the arithmetic of the formula shown, correctly. What it cannot prove: your measurements, or figures such as coverage per bag, waste and spacing, which are typical starting values you can change. Go by the product label and your local code.